Structural drying that finishes on a timeline, not when the instruments confirm it, leads to mold behind walls and the callbacks that follow. Our New London drying crew completes the program when the readings say it's done — not before.
The difference between structural drying done right and structural drying done fast is what ends up in your walls three months later.
Undersized or generic dehumidification is the most common technical failure in New London drying projects.
Every active drying project in New London receives a daily psychrometric reading session: temperature, relative humidity, specific humidity, grains per pound of moisture in the air, and moisture content readings at fixed sensor points in each structural assembly. These readings are logged and provided as documentation of the drying program for your insurance claim. Drying is declared complete only when readings at all sensor points fall within the target EMC range for the material species being dried.
The wall framing cavity is where water damage most often leads to long-term problems in New London properties. After water events, wall cavities absorb moisture through both the drywall face and the framing itself — and standard floor-level drying equipment does not reach these cavities. Our New London crew drills calibrated access ports at the base of affected wall sections and inserts directional air nozzles that force conditioned airflow through the cavity space, pairing it with LGR dehumidification to achieve complete cavity drying alongside floor-level assemblies.
Insurance-formatted drying documentation means faster settlement and fewer adjuster callbacks.
COS Water Damage Restoration's New London structural drying service covers every assembly type and situation encountered in a water damage event — from standard floor and wall assemblies to hardwood systems, crawlspace framing, and multi-story moisture migration events.
Wall cavity drying in New London is standard procedure on every job where moisture mapping indicates wall system saturation.
Subfloor assemblies — OSB or plywood sheathing over floor joists — and hardwood flooring systems require targeted drying approaches because of their density and their tendency to cup, buckle, or swell when dried too aggressively or left wet too long. Our New London drying crew evaluates hardwood flooring species and moisture content before recommending drying-in-place versus removal, and when drying in place is appropriate, we use floor drying mats that direct conditioned air against the top face of the hardwood under controlled pressure — accelerating evaporation while minimizing the differential drying stress that causes cupping.
Crawlspace saturation after a water event in New London often goes undetected — we include it in every below-grade moisture mapping session.
Ceiling assembly drying is one of the more technically demanding aspects of water damage restoration in New London structures.
Large-scale commercial drying in New London is project-managed from day one with zone-specific reading logs.
Every active structural drying program in New London is also a mold prevention program — because the conditions that support mold growth (elevated moisture content in organic materials and elevated relative humidity in the air space) are exactly the conditions a drying program is designed to eliminate. Our daily reading sessions include assessment of the ambient RH and temperature conditions in each drying zone against the threshold conditions that support mold colonization. If readings suggest an elevated mold risk — particularly in projects where extraction was delayed — we address it proactively with targeted antimicrobial treatment during the active drying program.


Equipment before mapping is guesswork. Mapping before equipment is science.
Equipment placement is engineered based on the moisture map and assembly data — not placed by habit.
Daily readings, daily reporting, daily equipment adjustment if needed — documented throughout.
Completion is confirmed by instruments and documented in writing. No visual estimates.



"The most important thing about COS Water Damage Restoration's New London structural drying was that they explained the readings to me every single day. I understood what the numbers meant, what the target was, and how far we were from completion. By day six I was watching the moisture content readings in our wall framing drop from 28% to 11% and understood exactly what was happening and why. That level of transparency is what you need when your home is full of drying equipment for a week."
"The thermal imaging session at the beginning was what showed us the water had migrated into a wall cavity adjacent to the flooded room that we never would have found otherwise. COS Water Damage Restoration set up wall cavity drying for that section specifically, and the final readings confirmed it came out completely dry alongside everything else. That's the kind of detail that prevents the mold problem three months later."
"We manage several New London commercial properties and structural drying after water events is something we deal with periodically. COS Water Damage Restoration is the only company we use because of their documentation process. Zone-specific readings, daily logs we can review from our office, and a written drying completion report at the end of every project. When a tenant asks for proof that remediation was complete, we have an instrument-confirmed document, not a technician's verbal assurance."
COS Water Damage Restoration's New London structural drying team serves New London and surrounding communities throughout MN. Daily monitoring included. Call +1-844-499-0972 to get started.
Structural drying that's done when it looks done leads to mold. Structural drying that's done when the readings confirm it leads to a genuinely recovered property. Call +1-844-499-0972 and our New London drying crew brings the instruments and the protocol.
📞 Call +1-844-499-0972 — New London Structural Drying24/7 Available · IICRC WRT Certified · Daily Readings · New London, MN